LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: UNIT 10 COOLING TOWER REPAIR
SCOPE OF WORK COMPLETED
- Checked and repaired the distribution valve disc.
- Replaced damaged louver casing.
- Replaced damaged spray nozzles.
- Replaced mechanical wood structures (transverse, diagonal, and longitudinal).
- Replaced hot water basin flooring.
- Replaced damaged splash bars.
- Replaced drift eliminators.