LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: REPAIR OF UNIT 1 and Unit 2 COOLING TOWER HOT WATER BASIN REPAIR
SCOPE OF WORK COMPLETED:
- Replaced sagging hot water basin flooring at Unit 1, Cell B (East Side).
- Repaired leak in the hot water basin inboard at Unit 1, Cell A (East Side).
- Repaired leak in the hot water basin inboard at Unit 2, Cell B (East Side).
- Repaired leak in the hot water basin inboard at Unit 2, Cell E (East Side).