MAKBAN GEOTHERMAL POWER PLANT

ABOITIZ POWER AND RENEWABLES INC.

LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: REPAIR OF VARIOUS COOLING TOWER STRUCTURE DUE TO TYPHOON PAENG

SCOPE OF WORK COMPLETED:

Replaced damaged louvers on various cooling tower units caused by Typhoon Paeng. The following details outline the number of louvers replaced per unit:

  • Unit 1: 66 pcs (East and West sides)
  • Unit 2: 22 pcs (East and West sides)
  • Unit 3: 3 pcs
  • Unit 4: 17 pcs (East and West sides)
  • Unit 5: 1 pc
  • Unit 9: 16 pcs (East and West sides); 10 pcs (both sides, estimated)
  • Unit 10: 2 pcs (East and West sides)
  •