Your Trusted Partner in Industrial Solutions
Delivering Quality Products and Services Since 2013 – A Reliable Source for Industrial Equipment, Importation, and After-Sales Support Across Various Sectors.
This captures the essence of the company’s experience, reliability, and product diversity. Does it align with what you’re looking for?
ABOITIZ POWER AND RENEWABLES INC.
MAKBAN GEOTHERMAL POWER PLANT
ABOITIZ POWER AND RENEWABLES INC.
LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: REPAIR OF VARIOUS COOLING TOWER STRUCTURE DUE TO TYPHOON PAENG
SCOPE OF WORK COMPLETED:
Replaced damaged louvers on various cooling tower units caused by Typhoon Paeng. The following details outline the number of louvers replaced per unit:
- Unit 1: 66 pcs (East and West sides)
- Unit 2: 22 pcs (East and West sides)
- Unit 3: 3 pcs
- Unit 4: 17 pcs (East and West sides)
- Unit 5: 1 pc
- Unit 9: 16 pcs (East and West sides); 10 pcs (both sides, estimated)
- Unit 10: 2 pcs (East and West sides)
Created Date
October 16, 2024Created By
AdminABOITIZ POWER AND RENEWABLES INC. (MAKBAN GEOTHERMAL POWER PLANT)
MAKBAN GEOTHERMAL POWER PLANT
ABOITIZ POWER AND RENEWABLES INC.
LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT : REPAIR OF UNIT 8 COOLING TOWER STRUCTURE
SCOPE OF WORK COMPLETED:
- Repaired the damaged distribution valve near CTF 8B cubicle (East side), including lapping of discs, leakage repair, and installation of discs and stem.
- Repaired leakage on the distribution valve platform (CTF 8B), with lamination applied where necessary.
- De-clogged and cleaned the clogged hot basin flower nozzles, and replaced missing nozzles (nozzles were supplied by APRI).
- Tightened bolts on cooling tower structures.
- Inspected and replaced missing splash bars (materials supplied by APRI).
- Applied Vulcaseal sealant to the corners of hot basin flooring.
- Inspected and replaced damaged transverse and longitudinal supports (2″ x 6″), with FRP material provided by the end user.
- Replaced/ repaired damaged louvers and sidings (manlift provided by the end user).
- Inspected and installed missing drift eliminators on both the East and West sides of the cooling tower.
- Replaced/ repaired dilapidated or damaged hot basin flooring with FRP materials (FRP materials were supplied by APRI).
Created Date
October 16, 2024Created By
AdminABOITIZ POWER AND RENEWABLES INC. (MAKBAN GEOTHERMAL POWER PLANT)
MAKBAN GEOTHERMAL POWER PLANT
ABOITIZ POWER AND RENEWABLES INC.
LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: REPAIR OF UNIT 1 and Unit 2 COOLING TOWER HOT WATER BASIN REPAIR
SCOPE OF WORK COMPLETED:
- Replaced sagging hot water basin flooring at Unit 1, Cell B (East Side).
- Repaired leak in the hot water basin inboard at Unit 1, Cell A (East Side).
- Repaired leak in the hot water basin inboard at Unit 2, Cell B (East Side).
- Repaired leak in the hot water basin inboard at Unit 2, Cell E (East Side).
Created Date
October 16, 2024Created By
AdminABOITIZ POWER AND RENEWABLES INC.-(MAKBAN GEOTHERMAL POWER PLANT)
MAKBAN GEOTHERMAL POWER PLANT
ABOITIZ POWER AND RENEWABLES INC.
LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: UNIT 4 COOLING TOWER FAN DECK UPGRADE AND STICK-BY-STICK REPLACEMENT
SCOPE OF WORK COMPLETED:
- Upgraded the fan deck and mechanical equipment support.
- Repaired the hot water basin.
- Repaired the distribution platform, valve, and pipe saddle.
- Repaired the splash bars, holders, and drift eliminators.
- Repaired the CT stairway.
- Repaired the louvers, casing, and end wall.
Created Date
October 16, 2024Created By
AdminABOITIZ POWER AND RENEWABLES INC. (MAKBAN GEOTHERMAL POWER PLANT)
MAKBAN GEOTHERMAL POWER PLANT
ABOITIZ POWER AND RENEWABLES INC.
LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: UNIT 10 COOLING TOWER REPAIR
SCOPE OF WORK COMPLETED
- Checked and repaired the distribution valve disc.
- Replaced damaged louver casing.
- Replaced damaged spray nozzles.
- Replaced mechanical wood structures (transverse, diagonal, and longitudinal).
- Replaced hot water basin flooring.
- Replaced damaged splash bars.
- Replaced drift eliminators.
Created Date
October 16, 2024Created By
AdminABOITIZ POWER AND RENEWABLES INC. (MAKBAN GEOTHERMAL POWER PLANT)
MAKBAN GEOTHERMAL POWER PLANT
ABOITIZ POWER AND RENEWABLES INC.
LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: Repair of Various Cooling Tower
SCOPE OF WORK COMPLETED:
Unit 2 Cooling Tower:
- Repaired sagging and damaged support on hot water basin flooring (Cell F, Front Side).
- Repaired leaks on hot water basin flooring inboard sections (Cell B and D, Back Side).
- Repaired damaged louver casing (Back Side).
Unit 3 Cooling Tower:
- Repaired leaks on hot water basin flooring inboard sections (Cell B, C, D, and E, Back Side).
Unit 4 Cooling Tower:
- Repaired damaged splash box (Cell F, Front Side).
- Repaired leaks on hot water basin flooring inboard sections (Cell B and C, Back Side).
- Repaired damaged NCG saddle support (Cell A, Back Side).
- Repaired damaged drift eliminator (Cell C).
Unit 7 Cooling Tower:
- Replaced damaged louver casing (Back Side).
Unit 8 Cooling Tower:
- Replaced damaged louver casing (Front Side).
Created Date
October 16, 2024Created By
AdminABOITIZ POWER AND RENEWABLES INC. (TIWI GEOTHERMAL POWER PLANT)
(TIWI GEOTHERMAL POWER PLANT)
ABOITIZ POWER AND RENEWABLES INC.
PROJECT: UNIT 2 COOLING TOWER REPAIR AND MAINTENANCE
SCOPE OF WORK COMPLETED:
- Inspected, maintained, and repaired critical components of the cooling tower structure at Tiwi Geothermal Power Plant.
- Secured structural connectors.
- Replaced FRP fan decks.
- Cleaned drift eliminators.
- Addressed rust on NCG pipe supports.
- Repaired the hot water basin, including sealing and replacing damaged parts.
- Removed sludge and cleaned the cold water basin and sump pit.
- Replaced damaged splash bars, hangers, and louvers.
- Cleaned debris and performed waste disposal.
- Conducted a final walk-through, testing, and de-mobilization before turn-over.
Created Date
October 16, 2024Created By
AdminABOITIZ POWER AND RENEWABLES INC. (TIWI GEOTHERMAL POWER PLANT)
(TIWI GEOTHERMAL POWER PLANT)
ABOITIZ POWER AND RENEWABLES INC.
Project: UNIT 1 AND UNIT 2 COOLING TOWER STAIRCASE INSTALLATION
SCOPE OF WORK COMPLETED:
- Installed cooling tower staircases for Units 1 and 2 at Tiwi Geothermal Power Plant, Barangay Naga, Tiwi, Albay, commissioned by Aboitiz Power and Renewables Inc.
- Project completed in 20 days.
- Mobilized and set up necessary facilities and safety measures.
- Dismantled existing monkey ladders.
- Installed new fiberglass-reinforced plastic (FRP) monkey ladders for Unit 1.
- Completed foundation work: excavation, formwork, and concrete pouring for FRP staircases and bridge interconnections.
- Installed tie backs and erected final staircase for Unit 2.
- Dismantled old structures and hauled debris.
- Conducted site walkthrough with the end user, testing, and commissioning.
- Completed final tasks, including painting and de-mobilization.