LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: Repair of Various Cooling Tower
SCOPE OF WORK COMPLETED:
Unit 2 Cooling Tower:
- Repaired sagging and damaged support on hot water basin flooring (Cell F, Front Side).
- Repaired leaks on hot water basin flooring inboard sections (Cell B and D, Back Side).
- Repaired damaged louver casing (Back Side).
Unit 3 Cooling Tower:
- Repaired leaks on hot water basin flooring inboard sections (Cell B, C, D, and E, Back Side).
Unit 4 Cooling Tower:
- Repaired damaged splash box (Cell F, Front Side).
- Repaired leaks on hot water basin flooring inboard sections (Cell B and C, Back Side).
- Repaired damaged NCG saddle support (Cell A, Back Side).
- Repaired damaged drift eliminator (Cell C).
Unit 7 Cooling Tower:
- Replaced damaged louver casing (Back Side).
Unit 8 Cooling Tower:
- Replaced damaged louver casing (Front Side).