LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT: UNIT 4 COOLING TOWER FAN DECK UPGRADE AND STICK-BY-STICK REPLACEMENT
SCOPE OF WORK COMPLETED:
- Upgraded the fan deck and mechanical equipment support.
- Repaired the hot water basin.
- Repaired the distribution platform, valve, and pipe saddle.
- Repaired the splash bars, holders, and drift eliminators.
- Repaired the CT stairway.
- Repaired the louvers, casing, and end wall.