LOCATION: Brgy. Limao, Calauan, Laguna
PROJECT : REPAIR OF UNIT 8 COOLING TOWER STRUCTURE
SCOPE OF WORK COMPLETED:
- Repaired the damaged distribution valve near CTF 8B cubicle (East side), including lapping of discs, leakage repair, and installation of discs and stem.
- Repaired leakage on the distribution valve platform (CTF 8B), with lamination applied where necessary.
- De-clogged and cleaned the clogged hot basin flower nozzles, and replaced missing nozzles (nozzles were supplied by APRI).
- Tightened bolts on cooling tower structures.
- Inspected and replaced missing splash bars (materials supplied by APRI).
- Applied Vulcaseal sealant to the corners of hot basin flooring.
- Inspected and replaced damaged transverse and longitudinal supports (2" x 6"), with FRP material provided by the end user.
- Replaced/ repaired damaged louvers and sidings (manlift provided by the end user).
- Inspected and installed missing drift eliminators on both the East and West sides of the cooling tower.
- Replaced/ repaired dilapidated or damaged hot basin flooring with FRP materials (FRP materials were supplied by APRI).